Building Works

The term building is used to define and describe all those constructions made artificially by the human being with diverse but specific purposes

...

Building Works

Buildings are works that the human being designs, plans and executes in different spaces, sizes and shapes, in most cases to inhabit them or use them as shelter spaces. The most common and widespread buildings are residential buildings, engineering constructions, shops, temples, monuments, industrial sites, among others.

A.I.F. INSTITUTE INFRASTRUCTURE CONSERVATION TELETÓN, IQUIQUE

A.I.F. INSTITUTE INFRASTRUCTURE CONSERVATION TELETÓN, IQUIQUE

The project consists of the improvement of differents enclosures and areas of the existing building, which is located in José Joaquín Pérez street # 999, Iquique, Tarapacá Region. Among the jobs to be inspected are; improvement of energy efficiency, for which it is considered a change in the lining of the envelope, incorporation of air conditioning system, replacement of windows, doors, lighting equipment, sanitary appliances, paintings, improvements in pavements of central patio, improvement of roof, construction of evacuation ramps from second level and minor extensions.

Initial contract amount: $ 997.707.106 CLP.

Construction company: Sociedad de Proyectos y Servicios Ltda.

Term: 270 days.

Advice end date: August, 2019.

A.I.F. RESEARCH STATION REPLACEMENT, VALDIVIA

A.I.F. RESEARCH STATION REPLACEMENT, VALDIVIA

The project consists of the construction of a 4,800 m2 building on an area of ​​approximately 10,000 m2, provided in bailment by the SERVIU of the Los Ríos Region, located on Avenue France with San Luis street, in the city Valdivia, Police Region of The rivers. The contract considers the execution of a virtual polygon, an institutional clinic, auditorium hall with a capacity for 180 people, interview room, multi-court, private institutional plaza. This headquarters also considers a system of access control and biometric locks in restricted sectors, closed circuit TV system and LED lighting and biomass central heating. These systems link electronic and software technology, with the possibility of controlling them through an IP address, improving the security of the building and delivering greater thermal and light comfort to each workstation, which in time will also result in energy savings considerable.

Initial contract amount: $ 8.564.951.718 CLP.

Construction company: COPCISA S.A. Agency in Chile.

Term: 750 days.

Consultation term date: February, 2020.

A.I.F. TEMPERED POOL CONSTRUCTION, TALCA

A.I.F. TEMPERED POOL CONSTRUCTION, TALCA

Contract that is developed through a design that seeks, as an objective, to achieve a building with a very clear and recognizable functional project; through the incorporation of circulations, accesses, dressing rooms, etc., in addition to considering an efficient use of natural light with a bioclimatic design that captures east light and sieves the west, through an adequate use of materials and economy of works. All this, developed in a building with a clean, direct architecture, with a clear and resounding image, giving an unique identity to the project for the Temperate Pool of Talca within the sports macro of Talca. It is located at Avenue Bernardo O’Higgins N ° 251, city of Talca, Maule Region.

Initial contract amount: $ 2.568.648.285 CLP.

Construction company: Constructora ABC Limitada.

Term: 420 days.

Advice end date: November, 2019.

A.I.F. REPLACEMENT ESC. F-94 M. ZULETA ASTUDILLO, HUASCO

A.I.F. REPLACEMENT ESC. F-94 M. ZULETA ASTUDILLO, HUASCO

The project consists of the replacement of the emblematic School of the city of Huasco, called School F-94 Mireya Zuleta A, located in the center of the same city on Street Maestranza n ° 115, next to the Plaza de Armas of the commune of Huasco, Atacama Region. It includes the construction of several modules, which has a destination for classrooms and various services; corresponding to the administration areas, multiple classrooms, library, multipurpose rooms, dining room, bathrooms, showers, dressing rooms, kitchen and courts.

Initial contract amount: $ 5.899.582.273 CLP.

Construction company: Constructora Cosal S.A.

Term: 540 days.

Advice end date: Octubre, 2019.

A.I.F. REPLACEMENT OF "TIERRAN DE CAMPEONES" STADIUM, IQUIQUE

A.I.F. REPLACEMENT OF "TIERRAN DE CAMPEONES" STADIUM, IQUIQUE

The project consists in the restitution of the Tierra de Campeones stadium, located at Avenue Salvador Allende 2950, ​​in the municipality of Iquique, Tarapacá Region. The work considers the total construction of the structure of the building, for it contemplates the restitution of the structure of walls of galleries, field with natural grass, athletic track, structure of cover (tensomembrana) and building of 5 levels. The building is distributed as follows; Level 1: sanitary facilities room and electrical installations room, gymnasium, dressing rooms, cafeterias, administrative offices; Level 2: dressing rooms, anti-doping rooms, nursing rooms, preheating areas, access to VIP lounge, access to the court and bleachers; Level 3: hygienic services man and women; sales, dungeon and nursing positions; Level 4: VIP lounge, VIP seats, terrace; sanitary facilities; Level 5: security control offices; radio and television transmission rooms. The total area to rebuild is 15,523 m2, on an area of ​​approximately 32,500 m2. The stadium will have 13,139 apartments, distributed as follows: north grandstand 4,346, southern grandstand 4,345, grandstand 3,167, peaceful grandstand 929, VIP seats 316 and disabled sector 36.

Initial contract amount: $ 23.252.365.507 CLP.

Construction company: Constructora ICAFAL Ingeniería y Construcción S.A.

Term: 550 days.

Advice end date: October, 2019.

A.I.F NORMALIZATION OF INFRASTRUCTURE OF THE HIGH SCHOOL OCTAVIO PALMA PÉREZ, ARICA

A.I.F NORMALIZATION OF INFRASTRUCTURE OF THE HIGH SCHOOL OCTAVIO PALMA PÉREZ, ARICA

The project consists of the remodeling and expansion of the High School Octavio Palma Pérez , located on Santa María Avenue No. 1697, commune of Arica, Arica and Parinacota Region. The work considers three types of interventions: remodeling, extension and complementary works. The remodeling works consider three pavilions of existing classrooms and ancillary services (Pavilions 1,2, and 3) and a gymnasium (pavilion 5) that must be remodeled with bathrooms and dressing rooms included. The extension works consider a third floor of classrooms in pavilion 1 and a two-story pavilion 4 of approximately 3,400 m2 built, considering inspection rooms, first aid rooms, administration offices, integration rooms, computer room, science workshop, learning resource center (CRA) and student casino on the first floor.

Initial contract amount: $ 12.215.801.649 CLP.

Construction company: : COSAL S.A. Chile.

Term: 510 days.

Advice end date: December, 2019.

A.I.F. CONSTRUCTION CHILDREN'S GARDEN WITH COT HALL, SECTOR EL ALTO

A.I.F. CONSTRUCTION CHILDREN'S GARDEN WITH COT HALL, SECTOR EL ALTO

The work corresponds to the Construction Kindergarten with Cot Hall, Sector El Alto, commune of Arica, Region of Arica and Parinacota. The project consists of a traditional construction site with reinforced concrete elements and metal structures. The project has a total land area of 2,530 m2, is developed on one level and the total area to be built corresponds to 1,050.82 m2. The work is basically divided into items of thick work; that involves so much earthworks, concrete, partitions and roofs, terminations; which considers insulation, skies, pavements, overalls, hardware in general, equipment both in classrooms and in the kitchen, and finally an item of facilities in which specialties such as sewerage and drinking water, air conditioning, electricity in general and the complement are developed of networks included in the project.

Initial contract amount: $ 2.199.160.095 CLP.

Construction company: : CIBEN E.I.R.L.

Term: 420 days.

Advice end date: Noviembre, 2018.

A.I.F. REPLACEMENT 6° COMISARÍA, CHILLÁN VIEJO BAJO PCSP

A.I.F. REPLACEMENT 6° COMISARÍA, CHILLÁN VIEJO BAJO PCSP

The project consists in the Replenishment of the 6th. Chillán Viejo Police Station under PCSP, located at Avenue Libertador Bernardo O’Higgins No. 2814, between Serrano and Luis Araneda streets, in the commune of Chillán Viejo, Bío Bío Region. The structure consists of three levels, not considered underground, contemplates an approximate area of 1,618.56m2. The enclosure is designed based on reinforced concrete walls 15 cm thick, which are lined on the outside by expanded polystyrene sheets 40cm thick and 20 mm for features, which are attached to the walls by means of adhesive . The vertical elements are executed in metal structure type Metalcon 90x38x12x0,85 mm. Acoustic insulation is considered 80mm thick glass wool, to finish with normal plasterboard or RH plaster coating as appropriate.

Initial contract amount: $ 2.462.880.540 CLP.

Construction company: ALCORP S.A.

Term: 360 days.

Advice end date: January, 2018.