Mining

The company has a highly qualified advisory team and ready for any question or need that is required.

...

MINING JOBS

The main mining works have been carried out at the state-owned company Codelco (National Copper Corporation).

THICKENERS 1-2-3 CODELCO CONCENTRATING PLANT DIVISION EL SALVADOR STAGE 1

THICKENERS 1-2-3 CODELCO CONCENTRATING PLANT DIVISION EL SALVADOR STAGE 1

Company: Codelco.

Contract Amount: $ 22.132.211 CLP.

Execution Time: 30 Days.

Work Progress: 100%

Professional Team: Civil Engineer, Mechanical Engineer, Risk preventionist.Equipment: Ferroscan System, Outdoor Laser, Testiguera HILTI DD, Hammer SCHMIDT, Moisture Meter, Ultrasound Meter MKIII.Partner InstitutionsLabotal, Dictuc.

Associated Institutions: Labotal, Dictuc.

SOCAVATION ANALYSIS SLAB SECTOR REFINERY NORTH CODELCO DIVISION EL SALVADOR - POTRERILLOS

SOCAVATION ANALYSIS SLAB SECTOR REFINERY NORTH CODELCO DIVISION EL SALVADOR - POTRERILLOS

Company: Codelco.

Contract amount: $6.947.220 CLP.

Execution time: 15 days.

Work Progress: 100%

Professional team: Civil Engineer, Assistant, Risks Prevention.

Equipment: Ferroscan System, Outdoor Laser Meter, Drilling Rig Hilti Dd.

THICKENERS 1-2-3 CODELCO CONCENTRATING PLANT DIVISION EL SALVADOR STAGE 2

THICKENERS 1-2-3 CODELCO CONCENTRATING PLANT DIVISION EL SALVADOR STAGE 2

Company: Codelco.

Contract Amount: $32.153.190 CLP.

Execution Time: 30 Days.

Work Progress: 50%

Professional Team: Civil Engineer, Assistant, Risks Prevention.

Equipment: Ferroscan System, Outdoor Laser, Drilling Rig HILTI DD, Original Schmidt Live, Moisture Meter, Pundit Array 250, GPR Live.

Associated Institutions: Labotal, Dictuc.

SOIL MECHANICS AND RESISTIVITY STUDY - EL SALVADOR CHEMICAL PLANT

SOIL MECHANICS AND RESISTIVITY STUDY - EL SALVADOR CHEMICAL PLANT

Company: Codelco.

Contract Amount: $10.668.090 CLP.

Execution Time: 30 Days Stage 2.

Work Progress: 50%

Professional Team: Civil Engineer, Electrical Civil Cngineer, Assistant, Risks Prevention.

Equipment: Seismograph FEA24, Fluke 1625.

Associated Institutions: Labotal.

ENGINEERING STUDIES FEASIBILITY, STANDARDIZATION OF CIRCULATING POND AND HYDROMETHALERG EMERGENCY, EL SALVADOR DIVISION

ENGINEERING STUDIES FEASIBILITY, STANDARDIZATION OF CIRCULATING POND AND HYDROMETHALERG EMERGENCY, EL SALVADOR DIVISION

Given the need for Codelco to relocate the circulation and emergency ponds due to their settlement due to the filtration of the chemicals from the plant to the ground, it is necessary to carry out a design project in which one of the main needs is carry out a study of soil mechanics in which the properties of this one are studied and the feasibility of locating the ponds in this area is determined.

The MASW (Multichanel Analysis of Surface Waves) method is one of the seismic methods for assessing the elastic condition of the soil for geotechnical engineering purposes. The measurements of surface seismic waves generated from various sources such as mallets, analyze the propagation speed of the surface waves and finally the variations of the velocity of shear waves (VS) under the studied area are deduced.