Patrimonial Works

They correspond to contracts of Historical - Artistic or Architectural interest where the harmony in façade composition, refined ornamental elements, materiality and outstanding construction techniques stand out.

...

Patromonial Works

The protection of the heritage built in Chile is under the protection of two legal parts:

  • Law No. 17,288, National Monuments.
  • General Law on Urban Planning and Construction (Article 60, second paragraph).

The first of these, the National Monuments Law aims to protect the heritage that has a valuation at the national level, protecting real estate under the category of “National Monument”. For its part, the General Law of Urban Planning and Construction aims to protect the assets that have a local valuation, delegating the power of such identification in the Community Regulatory Plans.

A.I.F. PARISH TEMPLE RESTORATION OF THE NIÑO JESÚS, VILLA ALEGRE

A.I.F. PARISH TEMPLE RESTORATION OF THE NIÑO JESÚS, VILLA ALEGRE

Work located in the commune of Villa Alegre, Maule Region. It corresponds to an elongated ship of 30 by 90 m. designed under the architectural guidelines of the neoclassical tradition. During the earthquake of 2010 the Church suffered considerable structural damage, product of the telluric movement, the longitudinal wall collapsed causing the ceiling, with its beams and false sky, to fall in the middle of the central nave of the temple. The restoration of this monument considers the rescue of the sky, the structural reinforcement through the insertion of buttresses of the north and south walls of the roof and sky of the central nave, the restitution of the lateral corridors and the integral repair of the bell tower.

Initial contract amount: $ 1.380.429.386 CLP.

Construction company: Proas Ltda.

Term: 420 days.

Advice end date: December, 2018.

A.I.F. RESTORATION AND HOME VALUE VIOLETA PARRA, SAN CARLOS

A.I.F. RESTORATION AND HOME VALUE VIOLETA PARRA, SAN CARLOS

Property located in the commune of San Carlos, in the province of Ñuble. The restoration includes 141 m2 of the original home; volume of a level with continuous facade, which is constituted by access hall enclosures, a central corridor that connects and articulates all the interior enclosures, two rooms, one on each side of the latter and a rear corridor that faces the courtyard, in addition of the construction of 344 m2 of new construction; volume of two levels with continuity of demarcations, which is constituted in its level-1 (semi-buried) by two multi-purpose workshops with their corresponding warehouses and in its level 1 by cafeteria-store, kitchen with manipulator bath, public toilets and workshop multipurpose with cellar. Finally, the rehabilitation of the inner courtyard of 306 square meters, all maintaining their original character.

Initial contract amount: $ 884.206.125 CLP.

Construction company: Proas Ltda.

Term: 360 days.

Advice end date: March, 2016.

A.I.F. RESTORATION OF CATHEDRAL NATIONAL MONUMENT, SAN MARCOS, ARICA

A.I.F. RESTORATION OF CATHEDRAL NATIONAL MONUMENT, SAN MARCOS, ARICA

A metal structure project with wooden doors, the cathedral was declared a National Monument of Chile in 1984. Inside is the Historic Monument of the Arica Bell, which weighs 900 kilos and arrived to the city in the first half of the century XVIII. Among the works to be carried out, it is considered to repair tile flooring and flooring, in addition to the vertical plates and cracks in the glass; paint stone walls, bleachers and esplanade pavement; restore gargoyles and rain gutters and equip the building with an exterior and interior lighting system.

Initial contract amount: $738.481.213 CLP.

Construction company: José Guerra & Cia Ltda.

Term: 365 days.

Date of termination advice: August, 2016.

A.I.F. MALDINI’S HOUSE RESTORATION DESIGN, COPIAPÓ

A.I.F. MALDINI’S HOUSE RESTORATION DESIGN, COPIAPÓ

Located in the Atacama Region and sent to be built in 1913 by the Italian immigrant Ambrogio Tornini, it was inhabited until the 1950s by his daughter and her husband, the Italian immigrant Luigi Maldini, the restoration execution process includes globally all the existing construction, because it requires an important replacement of its wooden structure, especially structural partitions and roof structure, it is also intended to reshape the backyard and the garden with a proposal of landscaping and renovation of pavements that rescues the original meaning of it by turning it into a multi-purpose outdoor space.

Initial contract amount: $ 1.572.684.840 CLP.

Construction company: Inmobiliaria e Inversiones Quilodran Ltda.

Term: 540 days.

Date of termination advice: In execution.

A.I.F. REPOSITION AND RESTORATION MUSEUM AND CHURCH SAN JOSÉ DEL CARMEN, EL HUIQUE

A.I.F. REPOSITION AND RESTORATION MUSEUM AND CHURCH SAN JOSÉ DEL CARMEN, EL HUIQUE

Located in the commune of Palmilla, it is the largest asset recovery project in the O’Higgins Region after the 2010 earthquake that hit the property heavily leaving it with serious structural damage, the tasks are concentrated in the recovery of the south wing of the declared property National Historic Monument in 1971, structural consolidation in the portico, church tower, the restoration of adobe walls, doors and windows, polychrome work in baseboards, front cover restoration, bell tower.

Initial contract amount: $ 1.817.027.000 CLP.

Construction company: Constructora Desco S.A.

Term: 540 days.

Date of end of advice: February, 2014.